Rumpus Room Specifications
Click here to download a printable version
1. Floor Frame
Steel base and steel floor joists
2. Floor
19mm T&G floor sheets
3. Framing
Steel wall and roof frames
4. Roof
Corrugated Colourbond roof
Colourbond gutters fitted with pop
5. Insulation
Thermafoil to roof and external walls
R3.0 batts to ceiling
R1.5 batts to external walls
6. External Linings
230mm Woodgrain Hardiplank to front wall
6.00mm Hardiflex to 3 walls
7. Internal Linings
10mm gyprock, 55mm Cornice
8. Windows
Aluminium sliding windows with fly screens as shown on plan
9. Doors
External 820mm solid duracote hinged door
Internal 820mm hollowcore redicote hinged doors
10. Hardware
Entrance lockset from builders range
Internal privacy sets from builders range
Flush pulls to sliding doors
11. Woodwork
External meranti architrave
Internal 67mm MDF skirtings and architraves
12. Electrical
According to room size
1 Hard wired smoke detector
Exhaust fan with mushroom vent for ensuites
Television point
1 External adaptable box
Ceiling batten and double power points according to room size
13. Painting
Internal & external to Owner’s selection
2 coats, 3 colours allowed
14. Bathroom
Shower alcove tiled to 1.80M
Walls tiled to 1.20M
Tiled floor
Tiles selection PC Sum $28.00M2
Shower screen from builders range
White dual flush toilet suite
White 2 door vanity unit 600mm x 350mm
Taps from builders range
Toilet roll holder from builders range
Towel rail from builders range
Quoted Price Includes:
· Council Plans and Approval – excluding any “special” conditions imposed by local Council
· Five-year structural warranty
· HIA Indemnity Insurance and C.I.T.B. Levy
· Supply and installation of blocks, ant caps and building tie downs
Owners Responsibility:
· To supply a clear level site and totally remove any grassed area under proposed building
· To provide any additional white-ant and corrosion protection that may be required
· External hookups to electricity , water, gas, sewer/septic and stormwater
· To have any new services installed
· Where applicable, obtain Council approval for septic tank system
Transportation / On Site Construction:
· Each rumpus room will be individually quoted for transportation or on site construction
Items not included in quoted prices:
· Base infill
· Steps
· Floor coverings
· Air conditioning
· Septic system
· Appliances
· Downpipes
· Stormwater system
· Any additional costs incurred to achieve energy efficiency requirements.